When will I be able to receive power during construction?

Gaston County Building Permits & Inspections currently has 3 forms of power:

- Saw Service: used during the construction process to power tools and other construction items

- Temporary-to-Permanent Power: this is an optional inspection that can be performed prior to all Final inspections being approved; since this is an optional inspection the General Contractor will have to complete the Temporary-Power-Application-PDF (gastongov.com) form and then upload a copy of the completed document to the 'Attachment' section of the building permit. A completed form will include all sub-contractors signatures, the General Contractors signature having been notarized and completed portion detailing why power is needed on the home. Please know that there is an additional $100 charge associated with this inspection that must be paid prior to scheduling the Temporary Power inspection.

- Final Power: Gaston County will approve for power to be placed on a structure once all final inspections are approved; if you opt for Temporary Power then the meter that was previously set by the energy provided will convert to permanent power

ONCE OUR INSPECTORS DEEM THAT AN ELECTRICAL METER CAN BE SET AT A PROPERTY, REGARDLESS THE POWER TYPE, IT IS THE CONTRACTOR OR OWNERS RESPONSIBILTY TO CONTACT THE ENERGY PROVIDER TO NOTIFY THEM OF INSPECTION APPROVAL AND TO HAVE THE METER SET. 

Show All Answers

1. Do I need an architect to draw my plans?
2. If I make changes on my approved plans, do I need to bring them back to plan review?
3. Who do I contact about asbestos or lead paint?
4. Who do I talk to about site grading, soil erosion, water quality, wetlands, stream run-off, etc.?
5. What do I need to get a Building Permit for a new single family dwelling, multi-family dwelling or mobile home?
6. When is a Licensed Contractor required?
7. When is a permit required for a residential accessory/storage building? If a permit is required what all documentation is needed to submit for the building permit?
8. When is a remodeling permit required?
9. Are there any restrictions to the number, size or location of buildings I can place on my property?
10. How do I apply for an Agricultural Exemption?
11. What Building Code(s) is enforced in Gaston County?
12. What's the difference between a modular home and a mobile home?
13. When do I need a permit from the Health Department?
14. What is the status of my permit request?
15. How do I request and/or cancel an inspection?
16. Where can I find information surrounding permit fees?
17. When will I be able to receive power during construction?